Stucco Assembly Detail

CMU Backing, Insulation, Lath & Scratch

This detail shows a three-coat Portland cement stucco assembly applied over a self-furring lath with 2 layers of weather resistive barrier (WRB) behind the lath. The structural backup is concrete masonry, with rigid insulation between Z-channel furring. A 1/4″ scratch coat and 1/2″ brown coat make up the base coat, with a finish coat on the surface.

Assembly

Wall

Primary Material

  • Stucco

Backing Material

  • CMU

Detail Location

  • Whole Wall

Assembly Type

  • Adhered Veneer

LET’S BUILD RESPONSIBLY.