02.610.0201: Injected Foam Insulation
![](https://imiweb.org/wp-content/uploads/2015/10/02.610.0201-1024x791.jpg)
02.410.0142: U-Block CMU Bond Beams
![](https://imiweb.org/wp-content/uploads/2015/10/02.410.0142-1024x791.jpg)
02.410.0141: Knock-Out CMU Bond Beams
![](https://imiweb.org/wp-content/uploads/2015/10/02.410.0141-1024x791.jpg)
02.410.0132: High Lift Grouting Procedures
![](https://imiweb.org/wp-content/uploads/2015/10/02.410.0132-1024x791.jpg)
This detail shows a concrete masonry (CMU) wall grouted using high lift grouting procedures. Vertical reinforcement is shown with optional rebar positioners, and vertical bars overlap to achieve sufficient development strength per structural design. Grout is applied vertically in lifts between 5′-0″ and 12′-8″, therefore cleanout openings may be required to ensure proper grout placement. […]
02.410.0124: Horizontal Joint Reinforcement Tolerance
![](https://imiweb.org/wp-content/uploads/2015/10/02.410.0124-1024x791.jpg)
02.410.0131: Low Lift Grouting Procedures
![](https://imiweb.org/wp-content/uploads/2015/10/02.410.0131-1024x791.jpg)
This detail shows a concrete masonry (CMU) wall grouted using low lift grouting procedures. Vertical reinforcement is shown with optional rebar positioners, and vertical bars overlap to achieve sufficient development strength per structural design. Grout is applied vertically in lifts not to exceed 5 feet, therefore cleanout openings may not be required. This detail shows […]
02.410.0123: Reinforcement Placement Tolerance
![](https://imiweb.org/wp-content/uploads/2015/10/02.410.0123-1024x791.jpg)
02.410.0122: Reinforcement Placement Tolerance
![](https://imiweb.org/wp-content/uploads/2015/10/02.410.0122-1024x791.jpg)
02.410.0121: Mortar Protrusion Tolerance
![](https://imiweb.org/wp-content/uploads/2015/10/02.410.0121-1024x791.jpg)
02.410.0114: Block Cleanout
![](https://imiweb.org/wp-content/uploads/02.410.0114-1024x791.png)