08.120.0852: Plank at Bearing Wall
![](https://imiweb.org/wp-content/uploads/2015/10/08.120.0852-1024x791.jpg)
09.070.0102: Stucco Assembly – Concrete Masonry Backup
![](https://imiweb.org/wp-content/uploads/2015/10/09.070.0102-1024x791.jpg)
09.070.0103: Stucco Assembly – Stucco Over CMU with Insulation
![](https://imiweb.org/wp-content/uploads/2015/10/09.070.0103-1024x791.jpg)
This detail shows a three coat Portland cement stucco assembly applied over self-furring lath with two layers of weather resistive barrier (WRB) behind the lath. The structural backup is concrete masonry, with rigid insulation between Z-channel furring. A 1/4″ scratch coat and 1/2″ brown coat make up the base coat, with a finish coat on […]
09.080.0101: Stucco Assembly – Sheathed Construction, Steel Framing
![](https://imiweb.org/wp-content/uploads/2015/10/09.080.0101-1024x791.jpg)
This detail shows a three coat Portland cement stucco assembly applied over self-furring lath to a backup of metal studs and sheathing. Two layers of weather resistive barrier (WRB) are used behind the lath. A 1/4″ scratch coat and 1/2″ brown coat make up the base coat, with a finish coat on the surface.
09.090.0101: Stucco Assembly – Sheathed Construction, Wood Framing
![](https://imiweb.org/wp-content/uploads/2015/10/09.090.01011-1024x791.jpg)
09.100.0101: Stucco Assembly – Skim Coat Direct to Concrete
![](https://imiweb.org/wp-content/uploads/2015/10/09.090.0101-1024x791.jpg)
09.100.0102: Stucco Assembly – Two Coat Stucco Direct to Concrete
![](https://imiweb.org/wp-content/uploads/2015/10/09.100.0102-1024x791.jpg)
09.100.0103: Stucco Assembly
![](https://imiweb.org/wp-content/uploads/2015/10/09.100.0103-1024x791.jpg)
09.410.1301: Control Joint Diagrams
![](https://imiweb.org/wp-content/uploads/2015/10/09.410.1301-1024x791.jpg)
04.030.0204: Exterior Stone Restraint Anchorage
![](https://imiweb.org/wp-content/uploads/2015/10/04.030.0204-1024x768.jpg)