04.030.0203: Exterior Stone Restraint Anchorage DOWNLOAD DETAIL Related posts06.110.0421: Tile Shower Assembly – Metal Studs, CBU Backing, Bonded Waterproof Membrane, Two-Stage DrainNovember 8, 201906.110.0415: Tile Shower Assembly – Metal Studs, CBU Backing, Mortar Bed Floor, Two-Stage Drain, Ceramic TileNovember 8, 201901.030.0332: Base of Wall Detail – Anchored Brick Veneer, CMU Backing, CMU FoundationJuly 31, 2019
06.110.0421: Tile Shower Assembly – Metal Studs, CBU Backing, Bonded Waterproof Membrane, Two-Stage DrainNovember 8, 2019
06.110.0415: Tile Shower Assembly – Metal Studs, CBU Backing, Mortar Bed Floor, Two-Stage Drain, Ceramic TileNovember 8, 2019